Post-Construction

Building or renovating a home/office takes time, planning and patience. After all of the work is complete, the project may look new, but most likely it is filled with dust and debris. We help contractors and builders turn over their final product to clients with beautiful attention to detail. After a big project, let us help you with the final details so you can rest and relax. We have experience from both sides and are very knowledgeable about the building and construction process. Post construction cleaning is something we’re very familiar with and we know the right way to hand over final projects.  No need to worry about the final cleaning; let us do the dirty work for you!

Phase one – Rough Clean

A rough cleaning is usually requested after the framing, plumbing and electrical have been installed and inspected. This phase can be done before or after the drywall is installed.

Phase two – Prep Clean

This cleaning is performed prior to the final “punch list” for all contractors. This is a more detailed cleaning of the house or unit. Floors will be vacuumed and mopped and then the place will be ready for punch out.

Phase Three – Final Cleaning

The final cleaning will take place after all contractors have finished their work and nobody else will be re-entering the house or unit. The final cleaning will consist of making sure all the dust is completely removed, all floors are mopped, carpets vacuumed, and any remaining detail work will be addressed. After the “final” cleaning the house or unit will be considered move in ready.

  • Detailed dusting of high and low areas
  • Wet wipe light fixtures & ceiling fans
  • Remove screws, nails, boxes & debris
  • Clean mirrors and glass surfaces
  • Dust walls, doors, baseboards & shelving
  • Remove stickers & overspray from windows
  • Clean & disinfect switch plates
  • Remove paint/grout haze on floors
  • Scrap, sweep and vacuum all floors and sills